Enshassi, A, Aziz, A R A and Karriri, A a E (2008) Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13(01), 35–47.

Hui, E C M and Ng, I M H (2008) A risk-based option pricing strategy for property valuation: an empirical study in Hong Kong. Journal of Financial Management of Property and Construction, 13(01), 48–59.

Odeyinka, H A, Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(01), 5–17.

Olatunji, O A (2008) A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria. Journal of Financial Management of Property and Construction, 13(01), 60–79.

  • Type: Journal Article
  • Keywords: Asset valuation; Construction industry; Nigeria; Project management; Tendering
  • ISBN/ISSN: 1366-4387
  • URL: https://doi.org/10.1108/13664380810882084
  • Abstract:
    Purpose – The purpose of this study is to investigate the relationship between tender figures, consultants' figures and final construction costs of construction projects under competitive bidding in the Nigerian construction industry, as guided by the due process policy, a national public procurement reform program. Design/methodology/approach – A total of 13 construction professionals and public contract administrators were interviewed. Their views were reported intermittently as the secondary data collected on 137 projects; 95 of these were construction and 42 supply projects. The findings are then analyzed and discussed. Findings – The study presents a number of regression models which can be used to predict the final cost and actual duration of construction and supply projects under the due process regime in Nigeria as functions of lowest bids, consultant estimates, successful bid, gross floor area, average bid, contractor's proposed contract duration and the consultant's proposed contract duration. Practical implications – The models used, apart from being worthy benchmarks for future study, can be of immense use to developing countries with the intention of implementing the due process policy of Nigeria in their countries as the limitations of the reform are succinctly discussed. Moreover, with the growing prospect for heavy engineering projects, the study will be of use to intending international contractors willing to explore the Nigerian construction market, either by holistic participation or by forming partnerships or alliances with Nigerian domestic firms. Originality/value – The paper presents one of the pioneering stochastic studies based on empirical data on construction and supply projects under the due process reform in Nigeria.

Voelker, C, Permana, A, Sachs, T and Tiong, R (2008) Political risk perception in Indonesian power projects. Journal of Financial Management of Property and Construction, 13(01), 18–34.